Balancing Strategies
--------------------

The GBT IF system has many ways to add gain and/or attenuation in the IF path, depending upon
the desired configuration. Before taking data with the GBT, you must ensure that all components
along the IF path have optimum input power levels. This process is referred to as **balancing**.

Balancing ensures for example that no components saturate and that amplifiers are in the most
linear part of their dynamic range. The system automatically adjusts power levels to optimum 
values when you issue the :func:`Balance() <astrid_commands.Balance>` command in AstrID. The
following discussion gives guidelines for when and how often to use the :func:`Balance() <astrid_commands.Balance>`
command.

Strategies for balancing the IF power levels depend upon the backend, the observing frequency,
the observing tactics, the weather and the objects being observed. The :ref:`references/backends/dcr:DCR`
has a dynamic range of about 10 (from about 0.5 to 5 Volts of IF power in the IF rack) in its
ability to handle changes in the brightness of the sky as seen by the GBT. The sky brightness
can change because of continuum emission of a source or a maser line as you move on and off the
source.  It can also change due to changes in the atmosphere's contribution to the system 
temperature as the elevation of the observations change or due to the weather.

Whenever you :func:`Balance() <astrid_commands.Balance>` you almost always change the variable 
attenuator. Each attenuator setting has a unique bandpass shape. So if you change attenuators
then you will likely see changes in the bandpasses and baseline of the raw data.  

There are not any set--in--stone rules for when you should balance the GBT IF system. However 
there are some guidelines which will allow you to determine when you should balance the IF system: 

#. You should balance the IF system after performing a configuration (i.e. after executing :func:`Configure() <astrid_commands.Configure>`).  
#. You should minimize the number of times you balance when observing.
#. If you know :math:`T_{sys} + T_{src}` will change by more than a factor of two (3 dB) when you
   change sources (not between and on and off observation) you should consider balancing.
   
   .. note:: 

    A change in power from :math:`P_1` to :math:`P_2` can be represented in dB by :math:`10 \log_{10} \left(\frac{P_1}{P_2}\right)` 
    
#. Try to avoid balancing while making maps.
#. Never balance between "signal" and "reference" observations (such as during an on/off observation).
#. If you are observing target sources and calibration sources then try not to balance between 
   observations of the targets and calibrators.


.. note:: 

   * If during your observing you expect to see a change in power levels on the sky that are 
     roughly equivalent to the GBT system temperature, then you should contact your GBT project 
     friend to discuss balancing strategies. There are no global solutions and each specific 
     case must be treated independently.
   
   * If the system temperature between "signal" and "reference" observations differ by a factor
     of two or more, :func:`BalanceOnOff() <astrid_commands.BalanceOnOff>` should be used in place
     of :func:`Balance() <astrid_commands.Balance>`. This will balance the IF power levels at the 
     midpoint of the two power levels at each sky position.



Balancing VEGAS
^^^^^^^^^^^^^^^

There are two aspects to VEGAS balancing that will produce separate error messages, so you should check
the origin carefully:

#. **Adjusting IF power levels upstream of the VEGAS ADC** 
    Power levels upstream of the VEGAS ADC are balanced so that the power going into an ADC is at an
    acceptable level.

    * **Balancing will fail if the input IF power levels to VEGAS is more than :math:`\pm`2dB from the target value of -20 dBFS** 
        VEGAS has a much higher range than that, but it is extremely rare that the observation/equipment
        combination should prevent the balancing algorithm from meeting the target. A conservative limit 
        was chosen since a failure normally means that some part of the system is not configured correctly, 
        or that there is hardware failure.  If an IF balancing failure occurs, the user (or operator) 
        should look for errors in the IF system and can view the actual IF power levels in the VEGAS CLEO
        screen (see :ref:`references/backends/vegas:Monitoring VEGAS observations`). If the power levels are 
        significantly different from -20 dBFS, there is a problem somewhere in the IF chain.

    * **If the power levels are different from -20 dBFS, but close to it, there may not be a real problem.**
        In some cases, the IF balancing will fail due to an exceptional, but acceptable circumstance; for 
        example, looking at an extremely bright source, or using a spectral window close to the edge of the
        receiver passband.  The IF balancing failure does not cause an abort, and it is often acceptable to
        continue observing under these circumstances.
    
        The useable dynamic range of VEGAS is actually >20 dB.  It is set at a low level by quantization 
        effects, and at high levels by saturation. If the IF power level looks reasonable, the next check
        is to look at the ADC histogram counts using the :ref:`references/backends/vegas:VEGAS Data Monitor (VEGASDM)`.

        .. image:: /references/backends/images/vegasdatamonitor.jpg

        As long as the histogram looks like a Gaussian distribution, with a a FWHM around 20 counts or 
        larger, but with no counts approaching :math:`\pm` 127, then the IF level into VEGAS is acceptable.
        Make sure you monitor the ADC histogram through all phases of your observation (e.g. switching on
        and off a bright source).
   
#. **Adjusting the "digital gain" inside the VEGAS processing firmware** 
   There should be no circumstances (e.g. an FFT overflow) which result in lost precision.     
   
   * **The digital gain should never fail to balance**. 
        It is a property of the firmware design of each mode, not the IF input. A failure of the digital
        gain balancing indicates a serious problem, and engineering support should be called.